Wetland Permit for Transmission Main and Elevated Water Storage Tank

LNV performed a wetland delineation on an approximately 3.7 acre site on Padre Island and prepared a pre-construction notification to the U.S. Army Corp of Engineers for Nationwide Permit No. 12 (Utility Line Activities) to allow the construction of a transmission main, elevated water storage tank and associated parking lot. Impacted wetlands were mitigated at a 1:1 ratio. LNV prepared a mitigation plan which included the construction of an approximately 0.23 acre wetland. LNV is currently conducting post-construction monitoring and documenting the progress of the mitigated wetland in accordance with the mitigation plan.



More Info

Location: Corpus Christi, Texas
Owner: The City of Corpus Christi